Regis Built have completed two stages for Storage King Narre Warren. The design phase of stage two involved coordinating structural and fire engineering to achieve an economical build solution. The process involved FRV approval. The final design included fire isolated stairs, lineal heat detection and compartmentalization.
The structural engineering involved three levels, that utilized steel framed floors and timber flooring.
Chat to us about your next multi-level construction project, we have demonstrated experience in design and project delivery.
Project Cost
$4 Million
PROJECT DURATION
40 Weeks
NUMBER OF UNITS
350 units
TOTAL SPACE
2,900 sqm NLA